Tesla Roof - Day 2

 On day two the Tesla crew focused on completing the Dry-In on remaining two sides of the house and completed all the flashing and electrical setup. Two Power Walls and a transfer switch were installed and the interconnect line to the roof and solar tiles were laid. Finally they laid the first dummy tile section on the steeple of the house.

Here is the Power Wall and the solar invertor.



Dummy Steel Tiles on the steeple of the House.


Interconnect in the attic for the Solar Tiles.

What a completed Dry-In phase looks like